Grid monitoring, in the field.
Our pilot system is running on a live distribution transformer, streaming data to our own secure platform. Production hardware is next.
Live today
Our pilot system is running on a live distribution transformer, streaming data to our own secure platform. Production hardware is next.
Building next
As solar and batteries replace generators, grids lose the inertia that kept them stable. Our grid-forming inverters will act as voltage sources, holding voltage and frequency on weak grids and keeping sites powered through outages.
Why now
On 13 May 2026, a single disturbance at Khavda cost India 8,963 MW of generation. CEA’s July 2026 advisory requires grid-forming inverters for battery projects of 50 MW and above. India needs this technology built at home.
Sources: GRID-INDIA presentation to the National Committee on Transmission, as reported by Renewable Watch; Central Electricity Authority advisory of 10 July 2026, clarified 4 August 2026.
Vision
We will own and operate solar, storage and grid-forming control, and deliver it to utilities and industries as stable, metered power.
Team